Year of Construction | 2018/5 ~2019/6 |
---|---|
Construction Period | 13 months |
Bridge length (m) | 11.05M |
Bridge width (m) | 3.54M |
Bridge height (m) | 7.5M |
Supporting Range | Scaffolding range 9.73m x 4.5m Cap bean thickness 3.24m |
Cycle time | 2018/6 ~ 2018/9 |
Precast size | Slab thickness 40cm |