WELCOME TO SUCOOT GROUP

WELCOME TO SUCOOT GROUP

Taoyuan MRT-CE02

  • Project:Taoyuan MRT-CE02
  • Type :Railway Bridge
  • Contractor :Kung Sing Engineering Corporation
  • Owner:Bureau of High Speed Rail, MOTC
  • Description:Total 300 spans, there are 12 sets material, took total 24 months to complete.
Year of Construction 2009~2013
Bridge length (m) 10500
Bridge width (m) 10
Bridge height (m) 6~18
Supporting Range Upper Structure for Bridge
Cycle time 2 spans/month
Description Total 300 spans, there are 12 sets material, took total 24 months to complete.
The Taoyuan MRT-CE02 Rail Bridge Project stands as a testament to advanced engineering and construction prowess. Utilizing state-of-the-art Ø60.2mm shoring and heavy duty scaffolding, this project showcases the potential of well-planned infrastructure development.