Year of Construction | 2009~2013 |
---|---|
Bridge length (m) | 10500 |
Bridge width (m) | 10 |
Bridge height (m) | 6~18 |
Supporting Range | Upper Structure for Bridge |
Cycle time | 2 spans/month |
Description | Total 300 spans, there are 12 sets material, took total 24 months to complete. |