Ta-Liao-Keng Creek Pumping Station

  • Project :Ta-Liao-Keng Creek Pumping Station
  • Type :Others
  • Contractor :Hon Yi Construction
  • Owner:New Taipei City Government
  • Description:
    1. Use heavy duty scaffolding to support top beam of slab form which thickness reach 40cm.
    2. Use light duty façade cover the peripheral area
    3. Staircase is used
Year of Construction 2018 May
Construction Period 6 month
Bridge length (m) 24
Bridge width (m) 8
Bridge height (m) 13
Supporting Range 7x23m
Cycle time 2 months
Material System :Ø60.2mm Shoring(Heavy Duty)、Formwork Top Beam& Base Beam