Use heavy duty scaffolding to support top beam of slab form which thickness reach 40cm.
Use light duty façade cover the peripheral area
Staircase is used
Year of Construction
2018 May
Construction Period
6 month
Bridge length (m)
24
Bridge width (m)
8
Bridge height (m)
13
Supporting Range
7x23m
Cycle time
2 months
At SUCOOT, we pride ourselves on delivering outstanding construction support with our high-strength Ø60.2mm shoring and heavy-duty scaffolding systems. Our expertise in integrating Formwork Upper Beam and Soldier Beam ensures that the Ta-Liao-Keng Creek Pumping Station project meets the highest standards of structural integrity and safety.
Our tailored solutions are designed to handle the demanding requirements of modern construction projects, providing superior load-bearing capacity and efficient assembly processes. Trust SUCOOT to elevate your construction projects with precision engineering and innovative design. For more information, please contact us today!