WELCOME TO SUCOOT GROUP

WELCOME TO SUCOOT GROUP

Kaohsiung MRT-CR5 Area

  • Project :Kaohsiung MRT-CR5 Area
  • Type :Railway station
  • Contractor :RSEA Engineering Corporation
  • Owner :Mass Rapid Transit Bureau, Kaohsiung City
Year of Construction 2004
Bridge length (m) 400
Bridge width (m) 16.5
Bridge height (m) 6.65+4.7
Supporting Range Scaffold for Platform and Concourse
Discover the robust application of Ø60.2mm shoring scaffolding systems in the Kaohsiung MRT-CR5 Area, a pivotal part of Taiwan's MRT/Railway Station Projects. SUCOOT has been a key player in providing innovative construction solutions since 2004, ensuring safety and efficiency in every project. Our heavy-duty shoring scaffolding is engineered for maximum support in platform and concourse construction, offering fast assembly and high load capacity.